Kamikoshi Shinkansen resumed operation

Kamietsu Shinkansen resumes operation September 10 at 2:31 a.m.

Due to heavy rain, the Kamikoshi Shinkansen was scheduled to be operated on the upper and lower lines between Tokyo Station and Echigo-Yuzawa Station, but at 2:14 a.m., both the upper and lower lines resumed operation. According to JR East, the Kamikoshi Shinkansen is scheduled to operate as usual from the first train on the morning of the 10th.