Tokaido Shinkansen: The number of trains will be reduced from around noon on the 10th, and the possibility of driving

Tokaido Shinkansen From around noon on October 8th, 18:27

According to JR Tokai, the Tokaido Shinkansen may be operated by reducing the number of trains between Tokyo and Shin-Osaka around noon on the 10th due to the approach of the typhoon, or there is a possibility that the operation will be delayed.

JR Tokai wants you to pay attention to future information.

JR East also on routes in Chiba Prefecture

With the approach of Typhoon No. 14, jr. East Chiba Branch announced that trains may be suspended or delayed on routes that run through Chiba Prefecture from the evening of October 10 to around noon on the 11th.

According to JR, there is a risk of canceling the operation,
Uchibo Line
Gaibo Line
Zhao Sobu Main Line
Kashiwa Narita Line
Zhao Kashima Line
Zhaodong Gold Line
This is the Asahi Kuri Line.

The Chiba branch of JR East wants to announce a detailed operation plan on the afternoon of September 9, and calls for the latest information to be checked on its website.